Machine MF860 MF60HX
Engine 1004.4 TLR2 T4.236
Power EEC 80/1269kW @ rpm 67/2200 66.4/2200
Standard tyres front 16/70x20 12.5/80x18
rear 16.9x30 18.4x26
Machine operating wgt as test kg 7,800 7,600
List price œstg POA 34,756
LOADER SPEC (7 in 1 bucket)
Bucket capacity(m3) 0.95
Breakout force(kg) 5,820 4,010
Dump clearance height(m) 2.75 2.65
Crowd at ground(deg) 47 48
Dump angle full height(deg) 57 50
Forward reach at full height(m) 0.64 0.71
BACKHOE SPEC
Dig depth dipper retracted (m) 4.46 4.5
extended(m) 5.86 5.85
Max reach @ ground dipper retraced(m) 5.88 5.62
extended(m) 7.18 6.83
Bucket breakout force(kg) 5,260 4,880
dipper retracted dig force(kg) 3,300 3,177
TEST 1: LOAD FROM SANDY GRAVEL, STOCKPILE DIRECT INTO TRUCKS
Total material loaded(t) 158.00 136.78
Average cycle time(sec) 19.68 23.87
Average bucket payload(t) 1.98 1.71
Average truck payload(t) 19.75 17.10
Average production rate(t/hr) 361.28 257.85
Production advantage(%) 40.12 -
Fuel consumption(litre/hr) 15.60 19.52
Fuel consumption advantage(%) 20.05 -
Fuel efficiency (t/litre) 23.16 13.21
Fuel efficiency advantage(%) 75.26 -
Unit cost(œ/100t) 4.51 6.60
Unit cost advantage(%) 31.66 -
TEST 2: TRENCH EXCAVATION TEST AT FULL ENGINE SPEED - 610MM WIDE
BUCKET
Total time taken for test (min) 133.01 142.02
Total material loaded(m3) 73.20 73.20
Average production rate(m3/hr) 33.02 30.92
Production advantage(%) 6.77 -
Fuel consumption(litre/hr) 12.21 17.99
Fuel consumption advantage(%) 32.16 -
Fuel efficiency(m3/litre) 2.71 1.72
Fuel efficiency advantage(%) 57.39 -
Unit cost(œ/100m3) 47.54 54.13
Unit cost advantage(%) 12.17 -
TEST 3: TRENCH EXCAVATION TEST AT FULL ENGINE SPEED - 914MM WIDE
BUCKET
Total time taken for test (min) 38.01 43.02
Total material loaded(m3) 36.56 36.56
Average production rate(m3/hr) 57.71 50.99
Production advantage(%) 13.81 -
Fuel consumption(litre/hr) 11.75 17.84
Fuel consumption advantage(%) 34.15 -
Fuel efficiency(m3/litre) 4.91 2.86
Fuel efficiency advantage(%) 94.77 -
Unit cost(œ/100m3) 27.06 32.77
Unit cost advantage(%) 19.32 -
TEST 4: TRENCH EXCAVATION TEST AT REDUCED ENGINE SPEED - 914MM WIDE
BUCKET
Total time taken for test (min) 46.46 47.31
Total material loaded(m3) 36.56 31.80
Average production rate(m3/hr) 47.21 40.33
Production advantage(%) 17.07 -
Fuel consumption(litre/hr) 8.20 14.32
Fuel consumption advantage(%) 42.72 -
Fuel efficiency(m3/litre) 5.75 2.82
Fuel efficiency advantage(%) 103.90 -
Unit cost(œ/100m3) 31.72 39.87
Unit cost advantage(%) 20.44 -
TEST 5: BASEMENT APPROACH RAMP
Total time taken for test (min) 19.25 28.23
Total material loaded(m3) 27.39 27.90
Average production rate(m3/hr) 85.37 59.30
Production advantage(%) 43.97 -
Fuel consumption(litre/hr) 13.93 18.50
Fuel consumption advantage(%) 24.69 -
Fuel efficiency(m3/litre) 6.13 3.20
Fuel efficiency advantage(%) 91.18 -
Unit cost(œ/100m3) 18.75 28.38
Unit cost advantage(%) 33.93 -
PARTS PRICING COMPARISON (œ)
New engine 3096.15 3372.19
Service exchange engine 1929.00 n/a
Crankshaft kit 723.52 723.52
Starter motor (new) 194.25 194.25
Service exchange starter motor n/a n/a
Engine lube oil filter 4.48 5.56
Main hydraulic filter 31.58 31.58
Tandem hydraulic pump (new) 523.25 n/a
Single hydraulic pump (new) n/a 458.00
Small hydraulic pump (steering) 192.08 215.46
Dipper ram service exchange n/a n/a
Dipper hose 32.45 64.23
Bucket tooth 8.61 8.61
Fermec does not currently operate an exchange facility but it is
the company's intention to introduce this service later this
year.
Product Support/ Warranty
No. UK dealers 15
No. of depots 31
No. Field service engineers 67
No. Service vehicles 43
Warranty(months/ hours):Currently 24 months extended warranty as
standard
In cab and external noise levels
In cab(dB(A)) 78 80
External(dB(A)) 105.7 105.6
Field Test calculations are based on 100% operator efficiency and
60 minute hours. No allowance made for waiting times for trucks.
Fuel consumption figures are recorded before and after each test.
Unit cost calculations based on hire rates of œ13.50/hour and
fuel costs of œ0.18/litre. Sound levels to EC Directive
86/662/EEC. Field Test rules demand that all machines and vehicles
are operated in accordance with safe site practices.