SGB build to access M25 viaduct


SGB Formwork has built a temporary structure over the M25 in Surrey as part of Mowlem's contract to widen the road between Junctions 10 and 11. The structure allows the contractor to upgrade the parapet of the New Haw viaduct as required by British Rail which has a line below the motorway.


ADVERTISEMENT

 
ADVERTISEMENT