Design and installation of landfill gas systems - States of Guernsey


STATES OF GUERNSEY

BOARD OF ADMINISTRATION

LANDFILL GAS MANAGEMENT SYSTEM
The States of Guernsey, Board of Administration invites expressions of
interest from contractors with experience in the design and installation of
landfill gas systems for the following:
 * Replacement of the temporary gas extraction system at Creve
Coeur closed landfill site with a permanent extraction system.
 * Provision of a landfill gas management system at Mont Cuet
operational landfill site, with flare compliant with TA Luft 1986 or
equivalent, and sufficient capacity for both sites.
 * Possible provision of a landfill gas utilisation scheme.
It is currently envisaged that a single contract will be let, but the

ADVERTISEMENT
 

States of Guernsey reserve the right to divide the work between
contractors. The contract(s) to be let will be performance based and the
appointed contractor(s) will be responsible for all design and construction.
For inclusion on the select tender list, contractors are required to
express their interest and supply details of their capabilities, recent
projects, and the addresses of three referees, by 30th April 2003. These
should be sent to:
Director of Environmental Services, Guernsey Technical Services, Sir
Charles Frossard House, La Charroterie, St Peter Port, Guernsey GY1 1FH.
Contractors requiring more information should contact:
Brian Latham, Enviros Ltd, Shrewsbury Business Park, Shrewsbury SY2 6LG.
Tel: 01743 284852.
Contractors wishing to visit the sites should contact: Rob Roussel, States
of Guernsey, Guernsey Technical Services Tel: 01481 717 226

 