Design, construction and installation of plant and power rooms - Watmos


WATMOS
HOUSING CO-OPERATIVE LIMITED

COMMUNITY HEATING WITH COMBINED
HEAT & POWER PROJECT,
BURROWES STREET
WALSALL WEST MIDLANDS
WATMOS has secured a development study grant funding from the Energy Saving
Trust to develop a community heating scheme with combined heat and power
system to 285 dwellings with the possibility of extending to other local
public buildings.
We are looking for organisations or consortiums who can provide technical
expertise to deliver the findings of the development study.
The works will include the design, construction and installation of plant
and power rooms including combined heat and power system, installation of
pipe work, infrastructure, with heating systems and heat metering, with

ADVERTISEMENT
 

prepayment within properties.
The organisation/consortium would operate the system for ten years from
completion.
Organisations/consortiums suitably qualified and experienced wishing to be
considered to tender for these works need to apply in writing to Mr P
Astbury Property Services Manager no later than 19th September 2003 for a
pre-qualification questionnaire and application form.
Completed questionnaires and application forms must be returned by 10th
October 2003.
All forms can be obtained and returned to:-
WATMOS Housing Co-operative Limited
29 Stafford Street
Walsall
WS2 8DG
Tel - 01922 471910
Fax - 01922 612967



ADVERTISEMENT

 
ADVERTISEMENT