Construction News are reporting that TfL have withdrawn the £300m Civil Maintenance Framework currently being tendered for the Bakerloo, Central, Victoria and Sub-surface lines (the ex-Metronet lines). It's important to note that this isn't the
Read More...
Read the complete post at http://londonreconnections.blogspot.com/2009/10/tfl-withdraws-bcv-and-ssl-civil.html