Sign in
|
Join
in
Current Tags
London Reconnections
External Blogs
(Entire Site)
Home
Blogs
Forums
Photos
ContractJournal.com
This Blog
Home
Syndication
RSS
Atom
Comments RSS
Recent Posts
The South London Line In Parliament
New ELL Footbridge
In Pictures: 38 Debendification
Oyster PAYG On National Rail From Jan 2nd
DLR: 3 Car Trains and Footbridges
Tags
airtrack
airwave
and finally
baker street
bakerloo line
battersea extension
blackfriars
board meetings
books
boris johnson
borismaster
buses
cannon street
central government
central line
circle line
congestion charge
construction projects
cross river tram
crossrail
crossrail 2
croxley rail link
croydon tram link
cycles
dagenham dock extension
DfT
discussions
district line
DLR
dlr horizon 2020
east london line
east thames buses
electrification
ell
eurostar
euston arch
evening standard
farringdon
first great western
freight
GOBLIN
hammersmith and city
heritage
High Speed One
history
imperial wharf
in pictures
johnston
jubilee line
kings cross
light rail
london assembly
London Cycle Hire Scheme
london underground
mayor's office
mayors questions
mayor's transport strategy
metronet
metropolitan line
national express
National Rail
network rail
news
north london line
northern line
olympics
outer london
overground
oyster
piccadilly line
policy
renovation works
river crossings
river ferry
river services
road
rolling stock
sll
snowday
South Central
south eastern
south london line
Southern
surrey canal road
tfl
thames crossings
thames estuary airport
thames gateway bridge
thameslink
transport committee report
travelwatch
tube lines
underground
victoria line
virgin
waterloo
waterloo and city
waterways
west london line
woolwich arsenal
London Reconnections
Browse by Tags
All Tags
»
metropolitan line
(
RSS
)
bakerloo line
central line
circle line
district line
hammersmith and city
history
metronet
tfl
tube lines
victoria line
TfL Withdraws BCV and SSL Civil Maintenance Framework Tender
Construction News are reporting that TfL have withdrawn the £300m Civil Maintenance Framework currently being tendered for the Bakerloo, Central, Victoria and Sub-surface lines (the ex-Metronet lines). It's important to note that this isn't the...
Posted
Oct 29 2009, 10:19 AM
by
London Reconnections
Filed under:
tfl
,
metronet
,
bakerloo line
,
metropolitan line
,
hammersmith and city
,
district line
,
circle line
,
victoria line
,
central line
Sub-Surface Signals Tender Goes Out
According to New Civil Engineer , TfL have officially begun the tendering process for the post-Metronet sub-surface signalling work. The sub-surface signalling work has been a transport hot-potato for some time. The work is urgently needed to replace...
Posted
Jul 28 2009, 09:03 AM
by
London Reconnections
Filed under:
tfl
,
metronet
,
metropolitan line
,
hammersmith and city
,
district line
,
circle line
Bridging the Funding Gap: Savings and Subsurface Signalling
Although the TfL Board Meeting is not until later this week, the Guardian claim to have details of some of the various budgetary changes that will be announced in an effort to close the current funding gap on the Tube. They claim that savings of up to...
Posted
Jun 22 2009, 11:21 AM
by
London Reconnections
Filed under:
tfl
,
metronet
,
tube lines
,
metropolitan line
,
hammersmith and city
,
district line
This Day In History: Trouble on the First Crossrail
From the Guardian's archive : Floods damage Metropolitan Railway tunnel 20 June 1862 Since the sinking of the Fleet ditch between Ray Street and Saffron Hill, great fears have been entertained by the contractors for the safety of the Metropolitan...
Posted
Jun 20 2009, 02:29 PM
by
London Reconnections
Filed under:
history
,
metropolitan line
© RBI 2001-2008